50 & 52 Terry Road, Box Hill

Box Hill Public & High School

PROJECT NAME
Box Hill Terry Road New Public School and High School – Early Works
CLIENT
NSW Department of Education (DoE)
PROJECT DURATION
12 Weeks
PROJECT VALUE
$1,700,000
No items found.

As part of the Early Works, NSW Department of Education (DoE)engaged Antoun’s Construction to undertake the demolition, site clearing andremediation works at 50 & 52 Terry Road, Box Hill.

The work completed included:

·       Siteestablishment, security and hoarding installation.

·       Removaland disposal of hazardous materials, incuding asbestos.

·       Airmonitoring, reporting and associated clearance certificates.

·       MajorServices disconnection

·       Sediment& Erosion Control

·       Aboriginaland heritage protection.

·       New waterand electrical installation and connection.

·       Demolitionof the existing structures

·       Remediationof the site area.

·       Levellingthe site area in preparation for the main works contractor.

‍

Thank you!

Your message has been received!
Oops! Something went wrong while submitting the form.
1
2
3
4
1
"Antoun’s have provided a good standard of service and have adhered to the contract requirements. Antouns have been responsive in resolving coordination issues discovered and achieved a consistently high standards of workmanship throughout the demolition works."

School Infrastructure NSW

2
"Antouns Construction performed extremely well in all aspects of the project. Good Environmental management and monitoring, work health safety managed very well during the entire project. Also the contractor is very collaborative with the principal all time."

Transport for NSW

3
"Antoun’s have worked with a high level of collaboration and communication with the project team. This has been demonstrated through ongoing cooperation to resolve coordination issues.
Antoun’s have established and are implementing a WHS Management Plan which complies with the contract, including the relevant NSW Government Management Systems guidelines and legislative requirements. Antoun’s have kept the site clean and tidy, and free of safety hazards. There has been no lost time due to injury and a demonstrated commitment to the highest WHS standards and the safety of everyone on the site."

School Infrastructure NSW

4
"Antoun’s have complied fully with the EMP, legislative requirements and met the requirements of the contract. The site has been kept clean and tidy, with appropriate environmental controls regularly maintained."

School Infrastructure NSW